Swan Building, Prestwick Park
Newcastle Upon Tyne, NE20 9SJ
Century Offices, 2175 Century Way
Thorpe Park, Leeds LS15 8ZB
0191 691 6770

Sheringham Leisure Centre

Community centre
Client Norstead
Location Sheringham
Scope Of Work Stages 4 & 5 Design & BIM

Project Detail

Our Role – Stages 4 & 5 Design & BIM

  • WGC have been commissioned by Norstead to deliver the stage 4 & 5 design and BIM of the mechanical, Electrical & public health engineering services for the new state of the art Leisure Centre within a rural setting.

Scheme – Specifics

  • Intricate Ventilation Design & CFD analysis
  • Modelled to BIM level 2 LOD 300
  • Energy Conscious Design

Our Duties

  • Design Verification of 3 package to enable completion of the stage 4 & 5 design
  • Full coordination drawings to LOD 300.