Client Norstead
Location Sheringham
Scope Of Work Stages 4 & 5 Design & BIM
Project Detail
Our Role – Stages 4 & 5 Design & BIM
- WGC have been commissioned by Norstead to deliver the stage 4 & 5 design and BIM of the mechanical, Electrical & public health engineering services for the new state of the art Leisure Centre within a rural setting.
Scheme – Specifics
- Intricate Ventilation Design & CFD analysis
- Modelled to BIM level 2 LOD 300
- Energy Conscious Design
Our Duties
- Design Verification of 3 package to enable completion of the stage 4 & 5 design
- Full coordination drawings to LOD 300.