Biomass Fuel Factory

Goole
Client Arc Applied Services
Scope Of Work Stages 4 & 5 Design & BIM

Project Detail

Our Role – Stages 4 & 5 Design & BIM

  • WGC have been commissioned by Arc Applied Services to deliver the stages, 3 4 & 5 design and BIM of the mechanical & public health engineering services for a new Wood Refinery in Goole

Schemes – Specifics

  • The scheme consists of a new Wood Refinery which is based on a current Austrian Design and will be the first to be built in the UK

Our Duties

  • Designs from RIBA Stages 3 to 4b.
  • Design assistance with CDP elements.