Battersea Power Station

Phase 3 Hotel
Client Halsion & Sir Robert McAlpine
Location London
Scope Of Work stage 4 & 5 design

Project Detail

Our Role – Stages 4 & 5 Design & BIM

  • WGC have been commissioned by Halsion & Sir Robert McAlpine to deliver the design & BIM to level of detail 400 for the prestigious and picturesque Battersea Power Station redevelopment.

Scheme – Specifics

  • £9.2billion development
  • MEP Design & BIM approach utilising WGC strategic Design & BIM Management protocols to ensure fluid design progression in line with tight MEP build sequence

Our Duties

  • Design Verification of 4A packages to enable completion of the stage 4 & 5 design
  • Full coordination & pre fabrication drawings to LOD 400.
  • Design assistance with CDP elements.